Foreman told me to stop buttering the ends of my brick and my walls got tighter
I was laying a garage wall in Rochester back in April and the foreman watched me for maybe 10 minutes before he said I was wasting mud on the ends of every brick. He said just slop the bed and shove it home, the head joint fills itself if the mix is right. I argued for a bit then gave it a shot and the courses came out dead level with way less squeeze out. Still feels wrong reaching for the trowel sometimes. Any of you run head joints dry or is it all about the bed for you?