Walked into a new parking garage in Tulsa and the joint lines in the slab blew me away
I was at the new garage off Cherry Street in Tulsa over the weekend and spent more time looking at the floor than the cars. They sawed the control joints in a big diamond pattern, probably 12 feet apart, and every line is dead straight. No raveling on the edges at all, which is rare for a pour that size. I ran my hand along one and it was smooth as a sidewalk. The stamping on the slabs was clean too, no cold joints showing through. Makes me want to know who did the work, anybody here ever finish a deck that size with joints that tight?