Question about the panel at a nursing home in Dayton that made me start labeling both ends
Found a 12-zone panel there where the old installer left no legend and the wires were all the same red. Now I tag both ends of every run, even on a one-day job, so has anyone got a faster way to track a mystery zone without pulling the whole can apart?