A cracked rafter in my own garage taught me to slow down on the miter saw
Last month I was framing a small shed in my backyard in Boise and rushed a 2x6 rafter cut on my miter saw, and the blade grabbed and split the board right down the middle. I stood there staring at the splintered end, then realized my blade was a 40-tooth finish blade, not a framing blade, and it was dull from cutting flooring scraps for weeks. I swapped in a cheap 24-tooth ripping blade I had in the truck, checked the fence for square, and the next six rafters cut clean with no kickback. Cost me $18 for the blade and about 20 minutes of rechecking my setup, way less than the board I wasted. What's your go-to tooth count for framing cuts, and do you keep a separate blade just for rough work?