Got chewed out for skimping on crane pad setup this morning
I was on a job in Austin today setting up for a tower crane pick, and I figured I could save time by using smaller pads than what the ground conditions called for. The foreman walked over after I leveled out and pointed out a soft spot I missed (only about 2 inches deep, but enough to shift the load). He made me redo the whole thing with bigger mats, which cost me an extra 45 minutes. I guess I was being lazy, but I've seen guys get away with it before. Have any of you had a close call from not checking ground bearing pressure close enough?