Finally nailed the transition strip on a tricky doorway
Been doing carpet for about 3 years now, mostly residential. Had this one doorway last Tuesday where the concrete slab was higher than the hardwood by almost half an inch, and I've always struggled with getting a clean transition there. Tried this old trick where I cut the tack strip at an angle and used a reducer instead of a standard T-molding, and it actually sat flush for once. Took me an extra 15 minutes but it looked way cleaner than my usual hack jobs. Anybody else got a go-to move for uneven subfloors like that?